United Premier Consultants Sdn Bhd’s Director, Ir. Wong Koe Hoong and Ir. Lai Chee Kuan has vast experience in Data Center developments.
The two projects involved are:
The project Cost is about RM450 Million. When completed in 3rd Quarter of 2012, it will be the first ‘Green’ Data centre in Malaysia. It has a White space of 120,000 ft2. Teliti Data Center has been acknowledged in the Malaysian Government’s Economic Transformation Programme (ETP) announced by Prime Minister Datuk Sri Mohd Najib Bin Tun Abdul Razak. This is a Tier-3 Data centre with Dual 33kV Incoming Power Supply and
Redundancy in All its M&E Infrastructure. Among the Data Center M&E Services include Uninterruptible Power System (UPS), Power Distribution Units (PDU) and Commando sockets, ATS, Generator Supply, Precision Air Condition, Water Leak Detection, Very Early Detection System (VESDA), Fire Suppression System (Inert Gas), Central Monitoring System, Raised Floor System, Video Wall, etc.
The project cost is about RM20 Million on fit-out work only; as it is in an existing building. The Data Center M&E Services include Uninterruptible Power System (UPS), Power Distribution Units (PDU) and Commando sockets, ATS, Generator Supply, Precision Air Condition, Water Leak Detection, Very Early Detection System (VESDA), Fire Suppression System (Inert Gas), Central Monitoring System, etc.